Ridgefield

The first 1.5 section of the Ridgefield NRVT will run north from Route 7 and Simpaug Tpke to the Redding border, near Bobby’s Court. This route – dubbed the Ridgefield Ramble – has received support from the Board of Selectmen and the Ridgefield Conservation Commission.

The trail plan for the Ridgefield Ramble has been completed.  Fundraising is now underway to fund the approximately $90,000 in pre-construction costs, including wetlands flagging, surveying, engineering and permitting.

MAPS:  Use the PDF version to see all of our current and future planned areas of the NRVT in Ridgefield.  You may print this map using the print button below it.  You may hold down your mouse and move it after zooming to navigate the maps.

Ridgefield_Redding_30x42

 

Click here for a downloadable, printable version of the map.

Ridgefield Ramble flyer

 

Print the Ridgefield Ramble Flyer.